Platform Solutions
Four integrated solutions that power your procurement journey. Each capability aligns with a stage of your journey from inputs to trade.
Your Journey, Powered by Platform Capabilities
Each stage of your procurement journey is powered by specific platform capabilities designed to deliver accurate, actionable insights.
Asset Energy Bill Management
Start with accurate data. Upload your energy bills and asset portfolios to unlock precise procurement recommendations. Our platform analyzes your consumption patterns, identifies optimization opportunities, and generates load profiles that power accurate pathway comparisons.
- Upload and store energy bills (PDF, Excel, CSV)
- Manage asset portfolios with facility details
- Automatic load profile generation from consumption data
- Bill analysis and consumption insights
- Historical data tracking and trend analysis
- Multi-facility portfolio management
This powers your:
Upload Bills
PDF, Excel, CSV formats
Load Profile Generation
Automatic analysis & insights
Portfolio Management
Multi-facility tracking
Scenario Planner & Policy Engine
Compare all procurement pathways side-by-side. See landed tariffs, savings projections, risks, and next steps in minutes — not weeks. Powered by our Policy Engine for state-specific accuracy.
- Compare CAPEX vs OPEX vs Group Captive vs Hybrid+BESS
- State-specific policy and charge calculations (via Policy Engine)
- Risk register with mitigations
- Recommended next steps checklist
Powered by:
Policy Engine
Always-current state-specific policy data. Open access charges, banking rules, CSS rates, and regulatory updates — automatically updated. Powers Scenario Planner calculations, and available standalone to check PPA conditions and state-specific requirements.
- State playbooks for Maharashtra, Karnataka, Rajasthan, Gujarat
- Real-time open access charge calculations
- Banking and CSS policy tracking
- Regulatory change alerts
- PPA condition verification (standalone feature)
PPA Evaluator & Risk Register
Get actionable insights powered by our PPA Evaluator and Risk Register. Every recommendation includes risk analysis, savings projections, and prioritized next steps.
- PPA clause risk analysis (generation, curtailment, LD, force majeure)
- Counterparty credit and operational risk checks
- IRR deck validation and stress testing
- Contract exit penalty and escalation analysis
Marketplace
Access vetted deals from our Marketplace. Every project and certificate is pre-screened through our due diligence process, ensuring you only see opportunities that meet our quality standards.
- Vetted PPAs (Open Access, Group Captive)
- SPV equity stakes and project investments
- I-RECs and Indian RECs for compliance
- Due diligence completed on all listings
All Procurement Pathways
Every pathway to renewable energy, explained. Compare costs, risks, and requirements to find the right fit for your facility.
Quick comparison
| Pathway | Cost Range | Capital Needed | Min Load | Contract | CSS Exempt |
|---|---|---|---|---|---|
| CAPEX OA | ₹3.2-4.5/kWh | Yes | 1000 kW | 25 years (ownership) | — |
| OPEX PPA | ₹4-5.5/kWh | No | 500 kW | 10-25 years | — |
| Group Captive | ₹3.5-4.8/kWh | Yes | 300 kW | 15-25 years | |
| Hybrid+BESS | ₹4.5-6.5/kWh | Yes | 2000 kW | 15-20 years | — |
| Rooftop | ₹3-4/kWh | No | 50 kW | 15-25 years (OPEX) or own | |
| RECs | ₹0.5-2/kWh | No | None | Annual purchase |
CAPEX Open Access
25 years (ownership)
Own a solar/wind plant, wheel power via open access. Best for long-term cost certainty.
Base cost
₹3.2-4.5/kWh
Min load
1000 kW
Key risks
- 1High upfront capital (₹4-5 Cr/MW)
- 2Policy changes on CSS/wheeling charges
- 3Land acquisition & permits
- 4Generation risk (weather, equipment)
Mitigations
- ✓Structure as SPV with project financing
- ✓Include tariff escalation clauses
- ✓Partner with experienced developers
- ✓Comprehensive O&M contract with guarantees
Recommended next steps
- 1Site assessment & feasibility study
- 2Financial modeling with current charges
- 3Developer shortlisting
- 4PPA/ownership structure review
OPEX PPA (Third-Party)
10-25 years
Long-term power purchase from developer-owned plant. No capex, predictable tariff.
Base cost
₹4-5.5/kWh
Min load
500 kW
Key risks
- 1Counterparty/developer risk
- 2Tariff escalation terms
- 3CSS changes over contract tenure
- 4Lock-in period penalties
Mitigations
- ✓Developer creditworthiness check
- ✓Cap escalation at 1-2% annually
- ✓Negotiate pass-through clauses
- ✓Reasonable exit provisions
Recommended next steps
- 1Load profile analysis
- 2RFP to shortlisted developers
- 3PPA term sheet negotiation
- 4Legal review of key clauses
Group Captive
15-25 years
Take 26% equity in a shared plant with other consumers. CSS exemption in most states.
Base cost
₹3.5-4.8/kWh
Min load
300 kW
Key risks
- 1Equity contribution required (26%)
- 2Co-investor dependency
- 3Regulatory scrutiny on captive status
- 4Exit complexity
Mitigations
- ✓Choose established SPV operators
- ✓Clear shareholder agreements
- ✓Proper compliance documentation
- ✓Pre-agreed exit mechanisms
Recommended next steps
- 1Identify group captive opportunities
- 2Equity requirement calculation
- 3SPV structure due diligence
- 4Shareholder agreement review
Hybrid + BESS
15-20 years
Solar-wind-storage combination for round-the-clock RE and peak shaving.
Base cost
₹4.5-6.5/kWh
Min load
2000 kW
Key risks
- 1Higher capital cost vs single-source
- 2Battery degradation & replacement
- 3Complex optimization
- 4Technology risk
Mitigations
- ✓Performance guarantees from integrator
- ✓Battery warranty & replacement provisions
- ✓Energy management system (EMS)
- ✓Phased deployment option
Recommended next steps
- 1Load curve analysis for RTC requirement
- 2Hybrid sizing optimization
- 3BESS technology selection
- 4Integrator evaluation
Rooftop Solar
15-25 years (OPEX) or own
Behind-the-meter solar on your premises. No open access charges, immediate savings.
Base cost
₹3-4/kWh
Min load
50 kW
Key risks
- 1Roof structural limitations
- 2Shadow analysis complexity
- 3Net metering policy changes
- 4Limited to available roof area
Mitigations
- ✓Structural assessment first
- ✓Professional shade analysis
- ✓OPEX model for policy flexibility
- ✓Maximize available space
Recommended next steps
- 1Roof survey & structural check
- 2Shadow analysis
- 3CAPEX vs OPEX comparison
- 4Installer shortlisting
RECs & Certificates
Annual purchase
Purchase I-RECs or RECs to meet RE targets without physical procurement.
Base cost
₹0.5-2/kWh
Min load
No minimum
Key risks
- 1Price volatility
- 2Additionality concerns
- 3Not a cost reduction strategy
- 4Reporting acceptance varies
Mitigations
- ✓Long-term supply agreements
- ✓Choose high-quality certificates
- ✓Combine with physical RE
- ✓Verify framework acceptance
Recommended next steps
- 1Determine certificate requirement
- 2Evaluate certificate types
- 3Supplier due diligence
- 4Procurement strategy